gogogo电影免费观看_gogogo大但人文艺瓣开_gogogo完整版国语版_gogogo手机高清在线观看_gogogo免费高清在线中国_gogogo免费高清完整电影沂水葛庄是哪_gogogo西西国语版高清版_gogogo高清国语完整_gogogo免费视频观看_gogogo高清在线观看_gogogo高清在线观看免费_gogogo电影的更新时间

  • Xinjiang LNG liquefaction plant 4MW power plant
  • Purpose:

    Gas Source:

    Location:

    Capacity:

    Work Scope:

    • DESCRIPTION


      項目介紹
      It includes a large ECU system, generator set controller IG-NTC, signal acquisition module, electronic speed regulation, display, DC power supply, etc. All unit control functions are centralized in this cabinet. Each unit is equipped with one local monitoring cabinet, which is placed on the unit side.
       
      Unit startup, speed regulation, automatic grid connection, power factor control, load addition and reduction
       
      Electricity measurement and display: U, 1, Hz, kW, kVA, PF, kWh
       
      Alarm and protection: overload/short circuit, overvoltage/undervoltage, overfrequency/underfrequency, reverse power, high winding temperature, overspeed, etc
       
      Collect various parameters of the unit, such as cylinder temperature, exhaust temperature, oil temperature, talent temperature, oil pressure, rotational speed, gas regulating valve opening, etc

    Service

    classification

    product

    recommendation

    Contact

    Information
    • Tel:0531-69953988
      13012995645
    • Add:101, Building 5, Liandong U Valley Science and Technology Innovation Center, Zhangjin Comprehensive Bonded Zone, No. 33688 Jingshi East Road, Suncun Street, Jinan Area, China (Shandong) Pilot Free Trade Zone

    截屏,微信識別二維碼